Groupe LAR inc.

Stop Log for Isle-Maligne Hydro Power Plant

Groupe LAR inc.

Location

Québec, Canada

Year

2021

Services and expertise

Details

The requirements

The Isle-Maligne power plant is the oldest in Rio Tinto's grid and plays a key role in managing the water level of Lac Saint-Jean. It also occupies a strategic position for the future of low-carbon aluminum production in Saguenay-Lac-Saint-Jean.

The project involved one (1) set of downstream gates consisting of six (6) sections and the accessories connected to these elements. The new logs must be functional with the current downstream embedded parts of the Isle-Maligne power plant.

The mandate consists of performing calculations, engineering, manufacturing and installation drawings, and procedures for six (6) Stop logs.

Mandate

The deliverables provided by LDV include:

Spreadsheet;

Engineering and plans;

Site surveys and survey sheets;

Review of drawings with the client;

Support during manufacturing.

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful. More information on our Policies

Strictly Necessary Cookies

Cette option doit être activée à tout moment afin que nous puissions enregistrer vos préférences pour les réglages de cookie.

Show details Hide details
Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.